Post-Operation Checklist

PLW-400X in the field

The Job Isn’t Done Until the Machine Is Secured

Every crew knows the pre-job routine: inspect the equipment, review the plan, hold the safety briefing. It’s second nature, and for good reason.

But the end of the shift is when fatigue sets in, daylight fades, and everyone is ready to head home. That makes the post-operation checklist just as important as the pre-job one. A machine that’s parked and shut down isn’t necessarily a machine that’s safe, secure, and ready for the next pull.

Start with the basics. Chock the wheels every time you park. Then walk the machine and check engine oil, radiator coolant, and hydraulic fluid levels. A small drop in any of them can be the first sign of a leak, and catching it at the end of the day means a quick fix instead of an unplanned shutdown in the morning.

Account for your gear. Return all grips, blocks, and other tools to the toolbox, then close and lock it. Missing equipment costs time and money, and loose tools are a hazard to anyone who walks by.

Secure the site. Confirm rope lines are tied off, remove the keys from the control panel, and apply the anti-vandal cover if your machine has one. Lock all engine panels. These steps protect your investment from theft, tampering, and unauthorized use.

Leave it clean. Clear out trash, rags, and loose material. Debris left on a machine can become a fire risk, interfere with moving parts, or hide a developing problem.

None of these steps takes long. Together, they protect your team, your equipment, and your schedule. Treat shutdown with the same discipline as startup, and the next crew to climb on, whether that’s tomorrow morning or next week, will be starting from a safe position.

Each Sherman+Reilly operator’s manual has post-operation instructions. Please follow the directions in your operator's manual for guidance on equipment procedures.

We’re dedicated to getting every lineman home, every night, no exceptions.